Vertical 8 of 10

Test and Reliability

Proving the part works, and keeps working.

Test is where a packaging line discovers what it actually produced. For automotive parts the reliability burden extends far past functional test into qualification programmes measured in months.

What these figures mean
Import dependency
The share of Indian demand for this input that is met by imports today. A percentage is published only where we can state the basis for it, and the build rejects a figure that has none. “Not established” means no sourced figure exists yet, not that the figure is zero; for the domestic picture, read “Made in India today” instead.
Made in India today
How much of this input is actually produced in India: none, pilot scale, partial, or established. This is the field to read when import dependency is not established.
MSME entry capital
What it would plausibly cost an Indian MSME to enter this input at the smallest viable scale, in crore rupees. Plant and equipment only; it excludes working capital and the qualification cycle.
Time to qualify
How long from a working sample to a qualified first shipment, once the line exists. Qualification, not construction, is what usually decides whether an entry succeeds.
India readiness tier
Our verdict on whether an Indian founder can realistically enter this input, derived from the four figures above and stated as one of three tiers.

The three tiers

Tier A: Buildable Now
Under roughly Rs 5 crore of entry capital and 12 to 24 months to a qualified first shipment. A founder can start here.
Tier B: Partnership or Distribution
There is real money here, but not in manufacturing the thing. The opening is in stocking, distribution, purity uplift or a licensed partnership.
Tier C: Not Yet
Requires a joint venture, a technology licence, or a multinational’s balance sheet. Worth understanding, not worth starting.

Made in India today

None
No Indian production we can identify. Demand is met entirely from abroad.
Pilot scale
Made in India at laboratory, pilot-line or single-customer scale only.
Partial
Real Indian production exists, but it covers part of the range or part of the demand.
Established
Indian production is routine and qualified, at commercial volume.

7 entries

Wafer Probe and Sort

Every die is tested while still on the wafer, so failures are mapped and discarded before any packaging cost is spent on them.

TierC
Imported 100%
EntryNot MSME
Qualify30+ mo

Final Test and ATE

The packaged part is exercised across its full electrical specification on automated test equipment, the operation that decides what actually ships.

TierA
Imported Not established
EntryRs 3–5 Cr
Qualify12–18 mo

Test Sockets and ATE Consumables

The mechanical interface between a packaged part and the test head, plus the consumable parts an automated test line wears through.

TierA
Imported Not established
EntryRs 1.5–3 Cr
Qualify12–18 mo

Test Handlers

The robotics that present each part to the test head at temperature and sort it into bins afterwards. Throughput of the test cell is set here, not by the tester.

TierB
Imported Not established
EntryRs 1.5–3 Cr
Qualify12–18 mo

Burn-in and Reliability Stress

Parts are held at elevated voltage and temperature for hours or weeks to force out infant mortality, and stressed to characterise how the population ages.

TierA
Imported Not established
EntryRs 3–5 Cr
Qualify12–18 mo

Failure Analysis Laboratory

The lab that establishes why a part failed: acoustic imaging for delamination, X-ray for voids, cross-sectioning and electron microscopy for everything else.

TierB
Imported Not established
Entry>Rs 15 Cr
Qualify12–18 mo

Automotive and JEDEC Qualification

The formal programmes (AEC-Q for automotive, JEDEC for the rest) that a package and its supply chain must pass before a customer will accept the part.

TierA
Imported Not established
Entry<Rs 1.5 Cr
Qualify18–30 mo